Targets
The main objectives of the Project can be summarized as follows:
- Hydro power generation using an installed capacity of 986 GWh/year (2*225 MW units)for reduction of green house gas emission (CO2)about 626.110 ton per year in the guide line of clean development mechanism.
- Reducing depreciation expenses of the thermal power plants
- Job creating in region during project construction and operation period.
- Creating entertainment and tourism surroundings for holidaymakers.
History and background
Pre-reconnaissance and reconnaissance studies were accomplished by Mahab Ghods Consulting Engineers for hydropower generation of Dez River Basin before 1994. Feasibility studies of Rudbar Lorestan Dam and HPP project was left to Ghods Niroo Consulting Engineers in 1994 and detail design studies contract was signed with Association of Ghods Niroo and British Halcrow as Leader Company in 2002. Construction of access roads and tunnels and diversion tunnel started in 2003.
Location and general layout
Rudbar Lorestan Dam and Hydropower Plant Project (HPP) is located on Rudbar River (in upper East of Dez River catchment area) in Zagros Mountain, and nearly 100 kilometers distance from South of Aligoodarz City in Lorestan Province.
The morphology of Rudbar River and its U-turn waterway in the Project location is in a way that a natural elevation difference of almost 300 m is formed.
River specifications
Rudbar River is one of the main branches of east Dez (or Bakhtiari) River. Main branches of this river include Ghalyan Rivers (formed by Dareh Dozdan, Daii and Dareh Leko branches), Kakolestan River and Vahregan River. This river circles around a series of U-shape heights with the length of 38 km on its way and its name changes to Alken River. Elevation difference of about 300 m of river bed at both sides of these heights has created an exceptional condition for energy generation, Alken River receives several small branches and its name changes to Liro River and then Ab Zalaki River while changing its direction towards the south and finally it is called Bakhtiari River after merging with Sarkool River.
Specifications of catchmnet area
Area of catchment area of river up to erection site of Rudbar Lorestan dam is 2255 square meters and average yearly current of river at dam site is 30.2 cubic meters per second. Minimum monthly flow of river after upstream off takes is about 4.1 cubic meter per second and its maximum flow is about 250.5 cubic meters per second. Yearly flow of this river is 957 million cubic meters and maximum probable flood of catchment is about 3734 cubic meters per second.
Features
- Natural elevation difference of more than 300 m between dam axis and the power-house.
- Project location in Lorestan Province and in the neighborhood of three Provinces of Isfahan, Chaharmahal Bakhtiari and Khuzestan.
- Climate variety, steep topography and severe access.
- Unsullied Land with fantastic tourism attractions, like Ab- Sefid Waterfall.
- Passing the 400 KV transmission line Shahid Abbaspur–Anjirak from Project Switchyard.
In this section the project basic information is presented in form of following items:
- Topography
- Meteorology
- Hydrology
- Flood
- Water quality
- Sedimentation
- Planning the water resources
- Geology
- Seismicity
- Dam reservoir
Topography
Rudbar Lorestan Dam is situated on Rudbar River( one of the main branches of east Dez River) 100 km south of Aligoodarz city in Lorestan Province and within the territory of Zagros chain of mountains in west of Iran. This region has a highly rough and tectonic topography.
Catchment Area |
Average elevation of Catchment |
Max Elevation |
General slope of catchment Area |
2255 KM2 |
2537 masl |
2500 masl |
7.27% |
Meteorology
Existence of high mountainous bulkheads south of Rudbar catchment area has caused a topographic situation so that currents of humid air masses create a special climate for this region by clashing with high mountains and deep valleys as the result of which these masses lose their humidity with precipitations from west and south to north and precipitations at north of catchment are reduced as of height increases. Rain gage stations of Zard Fahreh and Hargan in Kazem Abad that were constructed by Ab Niroo Company in 1383 at site location are being operated. These stations are operated periodically by Regional Water Organization and the company operates Ab Niroo station since three years ago.
Monthly rainfall on Catchment (mm) |
|||||||||||
Jan |
Feb |
Mar |
Apr |
May |
Jun |
July |
Aug |
Sep |
Oct |
Nov |
Dec |
48.4 |
100.4 |
60.2 |
70 |
60.9 |
0.5 |
0.1 |
0 |
4.9 |
0 |
71 |
92.7 |
Monthly Average Temperature at site (Cº) |
|||||||||||
Jan |
Feb |
Mar |
Apr |
May |
Jun |
July |
Aug |
Sep |
Oct |
Nov |
Dec |
1.5 |
2.1 |
6.1 |
11.6 |
17.2 |
22.6 |
26.2 |
26.5 |
23 |
17.4 |
11.1 |
5.3 |
Reservoir Monthly evaporation (mm) |
|||||||||||
Jan |
Feb |
Mar |
Apr |
May |
Jun |
July |
Aug |
Sep |
Oct |
Nov |
Dec |
26.5 |
26.5 |
55 |
107 |
165.9 |
244.5 |
243.1 |
246.1 |
217.1 |
174.2 |
114.2 |
58.8 |
Hydrology
Ab Rudbar River is one of the main branches of east branch of Dez or Bakhtiari River. Main branches of this river include Ghalian river (that is formed by merger of Dareh Dozdan, Dai and Dareh Elko main branchs), Kakolestan River and Vahregan River. This river circles around a chain of U- shape heights with the length of 38 meters on its way and changes its name to Alken River. Area of catchment area up to dam location is 2255 square meters and yearly current of river at dam site is equal to 30.2 cubic meters per second.
Flood
Quantity of flood with different return periods at dam location is estimated from relation of average flood.
Return period (Year) |
2 |
5 |
50 |
100 |
1000 |
10000 |
PMF |
Discharge (m3/s) |
435 |
720 |
1440 |
1630 |
2050 |
2500 |
3500 |
Water quality
Results of water quality in Rudbar axis are not available but quality of water in the closest station to axis is suitable for agricultural consumption and is classified as good for drinking purposes.
Sedimentation
Sedimentation load at location of Rudbar Dam is equal to 874785 tons per year and its special sedimentation has been estimated to be 1105.7 tons per square kilometer per year.
In connection with sedimentation issues some studies were carried out about Sediment flashing operations and manner of discharge of sediment from lower discharger but this issue was not continued due to risk of demolition of concrete and unknown matters.
Planning the water resources
Normal levels |
1756 |
Minimum levels of operation |
1721 |
Reservoir volume similar to normal levels |
228 |
Reservoir volume similar to minimum levels of operation |
104 |
Installation capacity |
450 Mega Watt |
Number of units |
2 |
Total energy |
986 Giga Watt per hour per year |
Average inlet current |
975.3 million cubic meters |
Overflow |
32.1 million cubic meters per year |
Design head |
430.74 m |
Minimum head |
401.74 m |
Maximum head |
436.74 m |
Design discharge of each unit |
57.8 cubic meters per second |
Geology

Seismicity
Building site of Rudbar Dam and power plant is situated in Zagros folded-driven ring. The closest active and seismogenic formation is Saravand- Boznavid fault (Ghalikooh fault) that is part of main young fault of Zagros. This fault is also called Bakhtiari and Ghalikooh fault as well. The most important formation in dam site is F1 fault. This fault crosses the dam axis and has been identified by fault mirror in the axis territory, inclination of fault plate is 90 degrees and level of its displacement is 6 meters. This fault is a right slip fault.
Important faults:
1- Saravand-Boznavid (Ghalikooh) fault
2- Eslam Abad fault
3- F1 fault
Silafor earthquake (January 1909) with 7.4 Richter scale has been reported 76 km from dam site.
Dam reservoir
Rudbar Lorestan Dam and Hydropower Plant Project (HPP) is located on Rudbar River (in upper East of Dez River catchment area) in Zagros Mountain, and nearly 100 kilometers distance from South of Aligoodarz City in Lorestan Province.
Volume of reservoir |
228 million cubic meters |
Useful volume |
115 million cubic meters |
Water minimum level |
1721 |
Water maximum level |
1764 |
Bedrock |
Dolomite lime (Dalan formation |
In this section the technical information of the project is presented in form of the following items:
- Dam body
- Body specifications
- Reservoir specifications
- Diversion system
- Instrumentation
- Spillway
- Quarries and their specifications
- Powerhouse
- General specifications of powerhouse
- Specification of powerhouse equipments
- Specification of powerhouse building
- Specification of powerhouse outlet tunnels
- Specification of powerhouse waterways
- Technical specifications of switchyard
- Water conveyance tunnels
- Specification of tunnels
- Intake structure
- Outlet structure
- Access roads and bridges
- Supplemantary operations
Body specifications
Dam type |
ECRD |
Height from foundation |
155 m |
Foundation width |
720 m |
Crest length |
185 m |
Crest width |
15 m |
Crest Elevation |
1765 m |
N.W.L |
1756 m.a.s.l |
Total Concrete Volume |
12000 m3 |
Dam body volume |
4.361.689 m3 |
Dam Embarkment Volume
Item |
Quantity (cu.m.) |
|
Rip rap |
64,378 |
|
Core |
487,109 |
|
filter |
2A |
138,582 |
2B |
135,961 |
|
Rockfill |
3A |
227,082 |
3B |
1,520,917 |
|
3C |
1,224,424 |
|
3D |
563,236 |
|
Sum |
4,361,689 |
Water Tightening system
Tightening Method |
Grout Curtain |
Total length of Grouting galleries (Access & Main) |
2,840 |
Total Length of Galleries |
127,000 |
Depth of grouting curtain |
92.5 |
Reservoir specifications.jpg)
Item |
Quantity |
Total Reservoir Volume |
228 (cu.m.) |
Usable Reservoir volume |
115 (cu.m.) |
Reservoir Surface |
4.11 (sq.km.) |
Annual Water control Volume |
960(Mcm) |
Reservoir Width |
200 m |
Reservoir Length |
20 km |
N.W.L |
1756 m.a.s.l |
Diversion system.jpg)
Location |
Left Abutment |
|
No. of Diversion Tunnels |
2 |
|
Tunnel length/Diversion Calvert |
No.1: 563 m & No.2: 720 m |
|
Typical cross section |
No. 1 |
Tunnel: Circle+ Culvert: Trapezoid |
No. 2 |
Tunnel: Circle |
|
Lining Type |
Concrete |
|
Tunnel Excavation Diameter |
9.5 m (old & New) |
|
Internal Diameter after lining |
8.m (No.1,2) |
|
Total Open-Cut and Underground Excavations |
113, 355 (cu.m.) |
|
Discharge Capacity |
No.1: 755 cu m/sec |
|
Type & Height of Coffer dam |
Rock fill by Soil Cement Face 35 m |
|
Concrete Volume in DiversionTunnel (Backfill Concrete & Structural Concrete) |
70,000 m3 |
Instrumentation
Instrument Supplier Company: SADAFZAR Co. Representative of SisGeo Italy
Number & Description of Instruments:
Electrical Piezometer: 83
Inclinometer and Settlement Meter: 5
Piezometer (Casa Grande): 13
Pressure Cell: 120
Accelograph: 6
Hydrostatic Settlement: 53
Extensometer: 268
Micro Geodesy point: 24
Spillway
Type of spillway |
Tunnels , 2 branches |
Location |
Left Abutment |
Maximum Reservoir Elevation in Flood |
1764 m.a.s.l |
Flood Discharge Capacity |
3445.71 (cu.m.) |
Total Spillway Length |
631m (2 Tunnels) |
N.W.L |
1756 m.a.s.l |
Spillway Design Discharge |
3342 cu.m./sec |
Type and Energy Dissipation Systems |
Flip bucket With 30m Radius and 36.34.m Length |
Quarries and their specification
1-Dam Body Mixed Core Sources (GC):
Chaleh Hatam Borrow Area (B, C, D) Fine aggregate:
Borrow Area |
Gravel Content (%) |
Sand Content (%) |
Silt Content (%) |
Clay Content (%) |
LL (%) |
PI (%) |
CL |
CH |
SC |
GC,GC-GM |
ML |
MH |
SM,SC-SM |
B |
6 |
15 |
48 |
31 |
47 |
25 |
31 |
33 |
4 |
3 |
- |
2 |
7 |
C |
5 |
11 |
53 |
31 |
44 |
23 |
43 |
15 |
1 |
- |
2 |
- |
- |
D |
11 |
24 |
37 |
28 |
41 |
20 |
5 |
2 |
1 |
1 |
- |
- |
- |
2-Filter Sources:
- Rock fill AX1 , AX2 (Course Borrow Area , Crushing Plant Output)
- ALG Borrow Area, River Sand
- Quarry AX1,AX2
Borrow Material Specification:
- Apparent unit Weight: 2.70 gr/ cm3
- Specific unit Weight: 2.71 gr/cm3
- Porosity: 0.96%
- Water absorption: 0.36%
- Dry Compressive Strength: 73.9 MPa
- Saturated Compressive Strength: 54.4 MPa
- Compressive Weight loss : 21 %
- Soundness Weight loss : 1.05%
- Loss Angeles Abrasion: 35%
General specifications of powerhouse
Type |
Surface |
Capacity |
450 MW (2 Units) |
Annual energy generation |
986 GWH |
Type of turbine |
Francis-Vertical Shaft |
Location |
Lorestan Province,100 Km South of Aligoodarz |
Critical Minimum Water Operation Level |
1721 m.a.s.l |
Normal Water Operation Level |
1756 m.a.s.l |
Maximum Water Operation Level |
1764.14 m.a.s.l |
Specifications of powerhouse equipments
Number of turbines |
2 units |
Generator Rated Output |
225 MW |
Turbine Rated Outed Output |
230 MW |
Rayedl Voltage of Generator |
15.75 KW |
Maximum Output |
95.12% |
Generator Speed |
300 RPM |
Turbine Design Head |
430.74 m |
Rated Current of Generator |
9300 A |
Turbine Rated Discharge |
57.8 m3/s |
Turbine /Generator Manufacturer |
Alstom |
Number and Type of Generators |
2 Units- 3 Phase Synchronous generator With Vertical Shaft |
Specifications of powerhouse building
1- General Speciation of Powerhouse
Powerhouse Length |
Powerhouse Width |
Powerhouse Height from Foundation |
100.5 m |
42 m |
56 m |
Total Concrete Volume (cu.m) |
Total Excavation Volume (cu.m) |
80000 |
720000 |
Tailrace length |
Tailrace Culvert Height |
50 m |
4.45 m |
Specifications of powerhouse outlet tunnels
In this regard no data exists.
Specifications of powerhouse waterways
Headrace Tunnel Length |
1334 |
Number of Penstocks |
2 lines |
Headrace Tunnel Diameter |
6 m |
Length of each Penstock |
2200 m |
Type of lining |
Reinforced Concrete |
Diameter of Penstock |
4.4~3.4 |
Technical specifications of post and switchyard
Switchyard & Transmission Line Specification |
|
Switchyard Voltage |
400 KV |
Busbar arrangement |
1.5 CB arrangement |
Number of Bay |
4 |
No. of Outlets |
2 |
Switchyard & Transmission Line Specification |
|
Number of transformers |
6 single phase + one spare |
Number of transformers feeders |
2 |
Rating of transformers |
85MVA |
Number of outgoing feeders |
2 |
Voltage of outgoing feeders |
400 KV |
Specifications of tunnels
Intake Tunnel Length |
1334 |
Length of each Penstock tunnel |
North Long: 747 m |
Headrace Tunnel Diameter |
6 m |
Diameter. of Penstock |
4.4~3.8 |
Number of Surge Tanks |
2 |
||
Type of lining |
Reinforced Concrete |
Type of Surge Tanks |
open |
Number of inlet Penstocks |
2 lines |
Height of Surge Tanks |
N: 122 m |
Number of outlet Penstocks |
2 lines |
Diameter of Surge Tanks |
6.2 m |
Length of each Penstock |
2200 m |
Intake structures
Item |
Quantity |
Item |
Quantity |
Number of openings |
1 |
Type of Opening |
1 Bell mouth |
Maximum design flow |
115.7 m3/s |
Type of Inlet Gates |
Roller slide gate |
Design Head |
48 m |
Width of Gates |
6 m |
Number of Gate |
2 |
Number of trash racks |
3 |
Outlet structures
In this regard no data exists.
Access roads and bridges
1-Access Roads Specifications
Item |
Length(km) |
Average Width (m) |
Renovation road from Horr-Abad to Gardaneh-Namak(2nd grade asphalt road) |
20 |
7 |
Access road from Gardaneh-Namak to powerhouse(B2) |
Approximately 22 km |
7 |
2-Technical specifications of the bridges
Bridge Title |
Width (m) |
Length(m) |
Smooth Bridge |
8.5 |
20 |
Item |
Length (m) |
access tunel to dam crest (T1) |
1554 |
access tunnel to dam heel (T2) |
1450 |
access tunnel (T3) |
203 |
access tunnel (T4) |
413 |
access tunnel (T5) |
330 |
access tunnel (T6) |
237 |
Tunnel Specification |
Quantity |
Height of tunnels |
8.5 m |
width of tunnels |
8.5 m |
Volume of underground Excavation |
600,000 m3 |
Geometry |
Horse shoe |
Complementary operations
1- Permanent buildings:
Due to long distance between The Job-Site and the nearest City (Aligudarz City), for accommodating the Personnel of Employer, Consultant and moreover for having the working offices, the following permanent structures have been constructed.
Item |
Description |
Area |
1 |
Guest Houses and Catering Areas |
5500 m2 |
2 |
Office Buildings and Assembly Hall |
2200 m2 |
3 |
Gym |
800 m2 |
4 |
Buildings such as Warehouse, Gas Station, Clinic, Bascule |
1500 m2(approx) |
5 |
Landscaping and Covered Parking Area |
10 acres (approx) |
2- Infrastructure facilities:
- For infrastructure facilities the following main activities have been implemented:
- Diesel power plant with the capacity of 5 Mega Watt
- Water supply network (potable and industrial water) including 5 underground and aerial water storages and approx 20 kilometers of water supply network
- Satellite data transmission facilities for exchanging of information/telecommucation between IWPC Head Office and Site
- Other facilities such as gas station and weight-bridge