Targets
The utilization of the allocated water for agricultural purposes of Bushehr Province land on the Liravi Plain is the main objective of the project and the secondary objective is to produce hydroelectric power. Generally, on the basis of the allocated water, a portion of water released by Chamshir Dam is diverted by a regulating-diversion dam and through a transmission system (including tunnel and pipeline systems) will be transmitted to the power plant and finally irrigation and drainage network.
History and background
Location and general layout
River specifications
Specifications of catchmnet area
Subsequent objections
Features
- Topography
- Meteorology
- Hydrology
- Flood
- Water quality
- Sedimentation
- Planning the water resources
- Geology
- Seismicity
- Dam reservoir
Topography

Meteorology

Hydrology

Parameter |
Quantity |
Area |
940.25 km2 |
Perimeter |
217.47 km |
Gravelius coefficient |
1.99 |
Equivalent rectangle length |
99.26 km |
Equivalent rectangular width |
9.47 km |
Main channel length |
91.05 km |
Main channel slope |
0.4% |
Mean elevation of basin |
528.54 m |
Flood
In order to calculate the flood, the regional analysis and SCS methods are used. Assuming the dam construction, flood of the mid-catchment between the dam and diversion-regulating dam with area of 940.25 km2 has been checked, in which case, after the flood routing at the situation of dam reservoir, amount of flood at dam location must be added to the presented results of basin. Flood design with return periods of 2 to 500 years has been calculated based on rainfall-runoff model.
Return Period (year) |
2 |
5 |
10 |
20 |
50 |
100 |
200 |
500 |
Flood |
175.0 |
370.7 |
543.9 |
744.3 |
1057.2 |
1336.9 |
1662.1 |
2168.0 |
Water quality

DATE |
Yield (m3/s) |
0 |
EC |
PH |
CO3 |
HCO3 |
CL |
SO4 |
Total Anions |
Ca++ |
Mg++ |
K+ |
Na+ |
Total Cations |
S.A.R |
Na% |
C-S |
1977/8/1 |
66.00 |
2193.81 |
3395.0 |
7.8 |
0.0 |
3.2 |
24.0 |
8.2 |
35.4 |
8.6 |
4.0 |
0.00 |
23.0 |
35.6 |
9.1 |
64.6 |
C4-S4 |
Sedimentation 
Planning the water resources 
Geology 
Seismicity 
Dam reservoir 
In this section the technical information of the project is presented in form of the following items:
- Dam body
- Body specifications
- Reservoir specifications
- Diversion system
- Instrumentation
- Quarries and their specifications
- Powerhouse
- General specifications of powerhouse
- Specifications of powerhouse equipments
- Specifications of powerhouse building
- Specifications of powerhouse outlet tunnels
- Specifications of powerhouse waterways
- Technical specifications of post and switchyard
- Water transfer tunnels
- Intake structures
- Outlet structures
- Access roads and bridges
- Complementary operations
- Specifications Irrigation and drainage network of Chamshir
Body specifications
Item |
Quantity |
Dam Type |
Concrete |
Height From Foundation |
7.15 |
Foundation width |
31.9 m |
Crest length |
125.5 m |
Crest width |
13.2 m |
Dam body volume |
54800 m3 |
Reservoir specifications.jpg)
Item |
Quantity |
Total Reservoir Volume |
3.75 m3 |
Reservoir Area |
79.8×104 m2 |
Reservoir Length |
4 km (approximately) |
Reservoir Width |
125.5 m (in average) |
N.W.L |
185.8 m |
Diversion system
Diversion during construction will be done in two stages by constructing an embankment which its length and maximum height are 400m and 7m, respectively. The designed discharge is about 1500 m3.
Instrumentation.jpg)
Instrument type |
Reason(s) |
Stress gauge - Piezometer - Strain gauge - Thermometer - Moisture meter |
Ground water level |
Stress gauge - Piezometer - Strain gauge - Thermometer - Moisture meter |
Probability of conglomerates falling |
Stress gauge - Piezometer - Strain gauge - Thermometer - Moisture meter |
Changing the geotechnical properties |
Stress gauge - Piezometer - Strain gauge - Thermometer - Moisture meter |
High overburden and slope |
Stress gauge - Piezometer - Strain gauge - Thermometer - Moisture meter |
Minimum overburden |
Stress gauge - Piezometer - Strain gauge - Thermometer - Moisture meter |
Squeezing zone |
Accelerograph - Thermometer- Moisture meter (at power plant location) |
Probability of landsliding in portal and its effects on forebay and outlet |
Quarries and their specifications
Borrowed sources of Chamshir regulating-diversion dam, transmission tunnel and irrigation-drainage network projects, to provide the materials for concrete are included two sand and gravel source called “Junction of Kheirabad-Zhoreh” and “Sholehzar”. “Junction of Kheirabad-Zhoreh” borrowed source has been located 3 km below Chamshir regulating-diversion dam site. “Sholehzar” borrowed source has been situated at 12 km upstream of the regulating-diversion dam and on the margins of the Gachsaran-Ganaveh road. Another borrowed source of soil has been located on the margins of Sardasht-Zeidoon asphalt road that would use to construct the access road. There are 3 borrowed sources of fine and 3 for coarse graded soil have been identified in irrigation-drainage network region. The coarse ones are Gamaran, Darehgap and Gorbe-e and the fine ones are Kenarkoh, Gavzard and Chahshirin-Malsanan. A limestone borrowed source has been identified for masonry structures, on the route of Zeidoon to Ameri village. It should be noted that, materials for constructing canal embankment are combination of the fine and coarse graded soils of the borrowed sources.
General specifications of powerhouse
Item |
Quantity |
Type |
Surface |
Capacity |
17 MW |
Annual energy generation |
90 GWH |
Turbine type |
Francis turbine with horizontal axis |
Specifications of powerhouse equipments
Item |
Quantity |
Unit |
3 |
Totall |
17 MW |
Specifications of powerhouse building
Due to the technical and economical studies, performance reliability of the units and orientation of turbine axis (horizontal or vertical), totally 3 Francis turbines with horizontal axis with 17MW power are introduced for installation capacity of Chamshir power plant. Chamshir power plant of diversion-regulating dam with 3 units of Francis turbine with horizontal axis contains the following parts:
- Machinery Saloon
- MV Room
- Control Room
- PLC Room
- Diesel Room
- Battery Room
- Tailrace
- Bypass system
- Storage
- Workshop
- Cable Room
- Ax. Transformer
- Yard Area
- Office
- Substation
Specifications of powerhouse outlet tunnels
Tailrace of power plant is situated under the machine hall and convoy outlet water from draft tubes to outlet channel by 3 channels. Dimensions of tailrace structure at draft tube position have been design to ensure flowing easily and control required submerged depth. The outlet channels are directed and joined together out of building. Stop-logs have been placed at junction of each channel to outlet basin for separating each unit from others on emergency occasions.
In designed flow rate, the normal tailrace level is 93 which is 2.9m above turbine axis. Invert level at tube draft and at canals intersection are 89 and 91.5, respectively.
Specifications of powerhouse waterways
Item |
Quantity |
Tunnel |
1 |
Tunnel Length |
6913 m |
Tunnel Type |
Circular |
Excavation Diameter |
5.3 m |
Finished Diameter |
4.6m |
Cover Type |
Concrete |
Total excavation volume (in open and closed spaces) |
155077 m3 |
Tunnel Capacity |
30 m3/s |
Technical specifications of post and switchyard
Consumer |
Required |
Transformator capacity |
TBM and ancillary equipment |
3920 |
5MVA-33KV/400V |
Segment site |
900 |
1250KVA-33KV/400V |
Crusher - Batching and related equipment |
720 |
1000KVA-33KV/400V |
Administration and Management Affairs Office |
160 |
250KVA-33 KV /400V |
Facilities and Accommodation Office |
425 |
630KVA-33KV/400V |
Total |
6125 |
Intake structures
Item |
Diversion- Regulation Dam |
Tunnel |
Box from Tunnel to Entrance of Forebay |
Forebay |
Outlet structures
Item |
Penstock |
Hydroelectric Power Plan |
Pipeline System (GRP) |
Trapezoidal Channel to the beginning of Irrigation and Drainage Network |
Access roads and bridges
1- Technical specifications of access roads:
Name of the road |
Average width (m) |
Length (km) |
Total length |
14 km (approximately) |
2- Technical specifications of the bridges:
Item |
Quantity |
Number of bridges |
23 |
This project does not include any access tunnel.
Complementary operations
1-Permanent buildings:
Construction of permanent buildings have been considered as below, to accommodate client and consultant personals
Item |
Detail |
Area |
1 |
A two-story building for operation and maintenance |
100 m2 |
Specifications irrigation and drainage network of Chamshir
Item |
Quantity |
Total Area Network (ha) |
36794 |
The total length of the main channel (km) |
89 |
The total length of the channel (km) |
46 |
Secondary channel length (km) |
80 |
The total length of the main drainage (km) |
19 |
Total length Rhksh grade (km) |
52 |
The total length of the secondary drainage (km) |
129 |
The total length of main pipe (km) |
99 |
The total length of the main half pipe (km) |
180 |